MBBR Retrofit Projects

Upgrading existing treatment plants by adding carriers to existing tanks.

Retrofit is one of the most compelling MBBR applications. Adding carriers to existing activated-sludge or aeration tanks converts them to MBBR or IFAS, increasing biological capacity by 50–200 % without building new tanks. This approach saves capital, minimises construction disruption and extends the life of existing infrastructure.

Common retrofit scenarios

  • Capacity upgrade: Population growth or industrial load increase has exceeded the original design capacity.
  • Nitrification addition: New ammonia limits require nitrification that the existing plant cannot achieve at the current SRT.
  • Footprint limitation: No land available for new tanks; the only option is to intensify the existing basins.
  • Activated-sludge conversion: Converting existing AS tanks to MBBR or IFAS for improved performance and simpler operation.
  • Plant modernisation: Aging infrastructure upgraded with modern biofilm technology rather than like-for-like replacement.

Typical retrofit scope

MBBR retrofit project characteristics (indicative)

ParameterTypical ValueUnitNotes
Capacity increase50–200+%Depends on existing tank volume and fill ratio.
Civil worksMinimal or none—Existing tanks reused; screens and aeration may need modification.
Construction disruptionLow—Can often be done with the plant partially online.
Typical project duration6–12monthsShorter than new-build; no concrete work.
Key modificationsScreens, aeration, carriers—Plus possible clarifier upgrade.

Engineering assessment for retrofit

Every retrofit project starts with a detailed assessment of the existing infrastructure: tank dimensions and condition, aeration system capacity, clarifier performance, and the gap between current and required treatment performance. Our engineers evaluate whether MBBR or IFAS is the better fit and develop a conversion plan that minimises risk and downtime.

Frequently Asked Questions

Can any activated-sludge tank be retrofitted to MBBR?
Most tanks can be retrofitted, but the feasibility depends on tank geometry (depth, aspect ratio), structural condition, aeration system compatibility and access for screen installation. An engineering assessment identifies any limitations early.
Do I need to shut down the plant for retrofit?
Usually not entirely. Many retrofit projects are executed in phases — one basin at a time — so the plant remains partially operational throughout. The detailed construction sequence is planned during engineering design.
MBBR or IFAS for retrofit?
IFAS (hybrid) keeps the existing suspended biomass and adds carriers for extra capacity. Pure MBBR replaces the suspended biomass entirely. IFAS is often the first choice for partial capacity upgrades; pure MBBR may be better when the existing AS system is at end-of-life.

Related Pages

Need MBBR Design Support?

Submit your wastewater data for a preliminary MBBR engineering assessment. Our team reviews every submission within 2 business days.