MBBR Capacity Upgrade

Adding carriers to an existing aeration tank raises its biological treatment capacity, letting a plant treat more load in the same volume.

A capacity upgrade increases the load a plant can treat without adding tank volume. In an MBBR upgrade this is achieved by introducing biofilm carriers, which add a large protected surface for biomass on top of any suspended-growth biomass already present. The additional attached biomass raises the treatable organic or nitrogen load. The achievable increase depends on the carrier fill ratio, the available surface area and whether aeration and solids separation can support the higher duty.

How added capacity is created

Each carrier provides protected surface area on which biofilm grows. Adding carriers therefore adds biomass independent of the clarifier return, which is what allows more load to be treated in the same tank. When the same tank is partly filled with carriers and still retains suspended biomass, the configuration is an IFAS system; when it operates on attached growth alone it is a pure MBBR.

The required added capacity sets the carrier volume; aeration must then supply the extra oxygen demand and keep the carriers moving.

Capacity Upgrade Levers (indicative — confirm per project)

ParameterTypical ValueUnitNotes
Carrier fill ratioup to ~65%Higher fill, more biomass surface
Added surface areaper media typem²/m³Protected area drives capacity
Aerationincrease—Extra oxygen + carrier mixing
ConfigMBBR or IFAS—Attached-only vs hybrid

Frequently Asked Questions

How much extra capacity can MBBR add?
It depends on the carrier fill ratio, the media surface area and whether aeration and clarification can support the higher load. There is no universal figure; the gain is calculated from the specific media and the treatment target for the plant.
What is the difference between MBBR and IFAS in an upgrade?
If the upgraded tank keeps suspended biomass alongside carriers, it is IFAS; if it operates on attached biofilm alone, it is a pure MBBR. IFAS is common in capacity upgrades of activated-sludge plants.
Does a capacity upgrade need more aeration?
Usually yes. More load means more oxygen demand, and the aeration system must also keep the added carriers in motion, so blowers and diffusers are checked and often upgraded.