Retrofit MBBR System

Upgrade existing activated-sludge plants and tanks to MBBR — add capacity, improve nitrification and meet tighter limits within the footprint you already have.

A retrofit MBBR system upgrades a plant that already exists. By adding carriers to an existing aeration basin — as an MBBR or as an IFAS hybrid alongside suspended sludge — the biomass in the tank increases without enlarging it, which can raise capacity or add nitrification within the current footprint. It is a targeted way to meet growth or tighter consents without a full rebuild.

What a retrofit involves

Typical scope includes carriers, retention screens on the outlets and an aeration grid adapted to move the carriers and transfer oxygen. In an IFAS configuration the existing sludge process is retained and carriers are added to boost treatment; in a full MBBR conversion the process moves to fixed film. Which approach fits depends on the existing plant, its loading and the treatment goal.

Our dedicated retrofit resources cover the specific cases — capacity upgrades, nitrification upgrades, footprint-limited sites and activated-sludge conversion — in more depth.

Retrofit MBBR — Configuration Choices (project-specific — confirmed per project)

ParameterTypical ValueUnitNotes
ApproachMBBR or IFAS—Full conversion or hybrid
Goalcapacity / nitrification—Within existing footprint
Scopecarriers + screens + aeration—Added to existing tank
Suitabilityper existing plant—Load + tank assessed
Sizing basisflow + load—Set during engineering review

Frequently Asked Questions

What is the difference between MBBR and IFAS retrofit?
In a full MBBR conversion the process becomes fixed-film. In IFAS, carriers are added to an existing activated-sludge tank so fixed biofilm and suspended sludge work together — useful when you want to boost an existing process rather than replace it.
Can a retrofit increase capacity without a bigger tank?
Yes — that is the main driver. Adding carriers increases the biomass held in the same tank, which can raise treatment capacity or add nitrification within the existing footprint, subject to assessment of the plant and its aeration.
Will my existing aeration work?
The aeration grid is usually reviewed and often adapted, because it must both transfer oxygen and keep the carriers moving. This is assessed against the existing plant during the engineering review.

Related Pages

Find Your MBBR Solution

Tell us about your wastewater, flow and treatment objectives. We will identify a suitable MBBR configuration and the next engineering step.